2007 September 30 (Day 10)
Weather: Overcast
Site: NT2-03 Pilot Hole B (33°14’ N, 136°42’ E)
Science Operations on Deck: 4 cores are taken and recovered at 12:45 on 30 September. LWD is preparing for the next operation.

Science Operations in Labs: Continued Science Seminar 7 covering using log data in subsurface geology and 3-D modeling of fractured reservoir studies. Witnessed coring and measurement process. Lab technicians made X-ray CT regular half-year inspection and supported for the 4 GeoTech coring in the process of cut, curate and measurements.