2007 October 25 (Day 35)
Weather: Rain
Site: C0003(NT2-01) (33°13’ N, 136°42’ E)
Science Operations on Deck: Attempting to pull out of the lower part of drill pipes and LWD assembly in the hole at Site C0003A (NT2-01). Running into with overshot assembly in the borehole.
Science Operations in Labs: Site summary meeting for the Site C0002A was held with discussion based on the presentations from each groups. Lab technicians continued handing over and testing instruments.