2007 December 13 (Day 28)
Weather: Overcast
Site: C0002 (NT3-01) (33°17’ N, 136°38’ E)
Science Operations on Deck: Cored continuously from 853.0 to 976.5 mbsf by RCB. Core recovery is around 30% in average.
Science Operations in Labs: Half of the Science Party disembarked. Half of Exp 316 Science Party came embarked instead. Cross-over between two Science Parties is being proceeded through processing of cores from the Hole C0002B. H.
Overall Science Update: Drilled through the base of the Kumano Basin around 920 mbsf, and penetrated into the top of the accretionary prism unit. Lithology and structures were drastically changed.