2007 December 31 (Day 13)
Weather: Fine but Cloudy
Site: C0006 (NT1-03) (33°01’ N, 136°47’ E)
The drilling operation was on standby due to the need for repairs to the motor that drives the Top Drive lubrication system.
Operations in the labs moved along well, and we have finished processing all the cores we have received.