2008 January 3 (Day 16)
Weather: Fine but Cloudy
Site: C0006 (NT1-03) (33°01’ N, 136°47’ E)

ESCS coring is continuing with good results: core quality and recovery have been consistently good. Some core disturbance related to drilling is occurring, but structures and sedimentary features remain readily observable. ESCS coring will continue as long as the situation remains the same. Several DVTP runs have been attempted, with variable success, however the last run was smooth and the data appears to be good. We will continue to attempt DVTP measurements as long as the equipment is operational and the formation is appropriate for the operation. Material recovered is consistently comprised of interbedded sand/silt/clay with some ash. Minor deformation structures observeed intermittently.