August 2011
Sun Mon Tue Wed Thu Fri Sat
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      
September 2011
Sun Mon Tue Wed Thu Fri Sat
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  
October 2011
Sun Mon Tue Wed Thu Fri Sat
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          
November 2011
Sun Mon Tue Wed Thu Fri Sat
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30      
December 2011
Sun Mon Tue Wed Thu Fri Sat
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
January 2012
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

29 Nov. 2011: Mirai

Nov.29Rainy / Cloudy

All of the instruments and observations are working well. After departed SE point, we are operating continous observation like Doppler radar, lidar, etc. 3-hourly launch of the radiosonde is also on-going. We stayed our mooring point near the center of the southern array from this morning to the evening to recover our subsurface buoy. After launching 15Z radiosonde, we depart the mooring point and head to Colombo.

In the morning time, we have some rain, but just cloudy in daytime and evening. Gradually the moisture amount decreases. The wind is northwesterly in lower troposphere, while reversed in upper troposphere.

BLOG_PHOTO

By MK