Construction 1 (NEW)
-
- April 2025
-
- ① Moored at the Quay
-
- ② Laying Cables for Multinarrow-Beam Echo Sounder
-
- ③ Power Converter Panel
-
- ④ Rotary Vane Steering Gear
-
- ⑤ Side-Mounted CTD Door
-
- ⑥ View of Dining Room from Galley Serving Window
-
- ⑦ Piping and Ductwork in the Laboratory Area
-
- ⑧ Thermal Insulation Work in Cabins
-
- March 2025
-
- ① Installation of Ice Window
-
- ② Installation of Anchor Chains
-
- ③ Installation of Observation Winch
-
- ④ Final Block Installation (Helicopter Deck)
-
- ⑤Filling the Dock Ahead of the Launch
-
- ⑥ Ready for the Launch Ceremony
-
- ⑦ Moving from the Dock to Quay Berth
-
- ⑧ CTD Moon Pool LARS
-
- February 2025
-
- ①Block Installation Status as of February 27 (Bow Side View)
-
- ②Propulsion Motor Installation
-
- ③Rudder Stock and Rudder Installation
-
- ④Bridge Block Installation
-
- ⑤Power Conversion Equipment Installation
-
- ⑥Deck Machinery Inside Bow Cover
-
- ⑦Radar Mast, Doppler Tower, etc.
-
- ⑧Observation Winch Delivery
-
- January 2025
-
- ①Block Installation Status as of January 31 (Bow Side View)
-
- ②LNG tank installation
-
- ③Propeller shaft installation work
-
- ④Funnel mark
-
- ⑤Multibeam echo sounder
-
- ⑥CTD transfer cart rails
-
- ⑦Thermal insulation installation completed (LNG tank area).
-
- ⑧Bow mooring deck
-
- ⑨Doppler radar mounting base
-
- December 2024
-
- ①Block Installation Status as of December 27 (Bow Side View)
-
- ②Aft observation deck: Crane post and Jib rest installed
-
- ③Lifeboat Davit installed
-
- ④Inside ship: Outfitting of the main generator exhaust pipes
-
- ⑤Air duct for Anti-Rolling Tank approx. 600mm in diameter
-
- ⑥Side CTD LARS mounting rails (Inverted position)
-
- ⑦Painting work is also gradually progressing
-
- ⑧Radar mast in a laid-down position
-
- ⑨Propellers delivered
-
- November 2024
-
- ① LNG Fuel Tank
-
LNG Fuel Tank (foreground) to be installed on Mirai Ⅱ and TCS (Tank Connection Space, background), which houses equipment for supplying LNG fuel to the DFD engine.
Check out our supplementary blog below! ☟(Available in Japanese)
https://www.jamstec.go.jp/parv/j/blog/20241213.html
-
- ② LNG Fuel Tank
-
View from TCS (Tank Connection Space) side
Check out our supplementary blog below! ☟(Available in Japanese)
https://www.jamstec.go.jp/parv/j/blog/20241213.html
-
- ③Block Installation Status as of November 29 (Bow Side View)
-
- ④Block Installation Status as of November 29(Stern Side View)
-
- ⑤Looking up view from the bottom
-
- ⑥Bridge and Whale Watch Room
-
- ⑦Interior construction progressing steadily
-
- ⑧Funnel
-
- ⑨ Installation work of a 4x4.2m moon pool hatch on the ship's bottom
-
- ⑩Low-voltage distribution panel installation
-
- October 2024
-
- ①Block Installation Status as of October 25 (Bow Side View)
-
- ②Block Installation Status as of October 25 (Stern Side View)
-
- ③Retractable Bow Thruster installation
-
- ④Main generator installation
-
- ⑤Completion of four main generator installations
-
- ⑥Engine control room console
-
- ⑦Exhaust pipe construction
-
- September 2024
-
- ①Retractable Stern Thruster Installation
-
- ②1st Block Installation
-
- ③Side Shell Block Installation
-
- ④Completion of High Voltage Switchboard Installation
-
- ⑤Block Installation Status as of September 27 (Bow Side View)
-
- ⑥Block Installation Status as of September 26 (Stern Side View)
-
- ⑦Pre-Installation of Shower Units in Cabin (White Covering)
-
- ⑧Ceiling Pipes and Electrical Circuits Installed
-
- ⑨Deck Deformation Correction Work in Progress
-
- August 2024
-
- ①Ship Bow Block
-
- ②Recess for Anchor Storage
-
- ③Side Shell Block
-
- ④Bridge Block
-
- ⑤Cabin C+D Deck Integration
-
- ⑥Block with Retractable Stern Thruster
-
- ⑦Ladder Installation Area & Ladder Horn
-
- ⑧Funnel (Chimney)
-
- July 2024
-
- Ventilation Duct
-
- Partition Valve
-
- ③ Engine Room Piping Unit
-
- ④Cabin C area
-
- ⑤Cabin C area
-
- ⑥Cabin C area
-
- ⑦ Assembled Moon Pool Compartment Block
-
- ⑧ Engine Room Main Generator Base
-
- ⑨ Stern Tube for Protecting the Propeller Shaft
-
- June 2024
-
- ①Wire supports in stock
-
- ②Tank heating pipe
-
- ③Tunnel bow thruster installation
-
- ④Ship bottom blocks
-
- ⑤Ship bottom blocks
-
- ⑥Bone structural parts in tight spacing
-
- ⑦Complex curved shapes
-
- ⑧Installing external panels
-
- May 2024
-
- ①Various shapes of blocks
-
- ②Various shapes of blocks
-
- ③Piping and wire support installation begins.
-
- ④Various shapes of blocks
-
- ⑤Various shapes of blocks
-
- ⑥Various shapes of blocks
-
- ⑦Various shapes of blocks
-
- ⑧SUS Clad steel plates for stern
-
- April 2024
-
- ①Surface plate receiving curved blocks
-
- ②Trolley for transporting blocks
-
- ③Plate bending work
-
- ④Verifying bending accuracy
-
- ⑤Plates with plate bending