Earth Simulator(ES2) Operation Status


Earth Simulator(ES2) Operation Status



Description
This graph shows ES computing resource distribution based on job size .

  • Computing resource = node x hours
  • job size = number of nodes in use per job
  • ES operation stop related with replacement of the cooling equipment.
    [DATE] From Dec/1/2013 (Sun) to Dec/24/2013 (Tue).



Back