Earth Simulator(ES2) Operation Status
Description
This graph shows the averages of staging date transfer (stage-in and stage-out) per job
- ES operation stop related with replacement of the cooling equipment.
[DATE] From Dec/1/2013 (Sun) to Dec/24/2013 (Tue).